SV-CE<500-L2.1
Electrical plant management: generators, shore power, batteries and emergency power
SV-CE<500-M2 · Electrical, electronic and control engineering at the management level · SV-CE<500-M2-A Planning and protecting the electrical plant, safe isolation, control and alarm systems, and the emergency controls a sole engineer must know and prove.
On a small yacht the chief engineer is also the electrician. The examiner wants to know you can **plan and protect** the electrical plant, not just start a generator.
Independent study. xplor is not an accredited training provider and awards no certificate or Certificate of Competency. The SV Chief Engineer CoC also requires qualifying SV EOOW sea service, the MCA-approved Chief Engineer Statutory and Operational Requirements and Auxiliary Equipment Part II modules and examinations, the ancillary courses in MSN 1904 section 6 (including HELM (Management)), and an oral examination conducted by an MCA examiner. AI-drafted content pending subject-matter-expert review.